ARTEMIS JU Call 2008

On this page you will find a short overview / summary of the approved ARTEMIS Call 2008 projects. For more information on the projects, please click on the name of the project.

 

                       ARTEMIS JU Call 2008 PROJECTS

Total Budget:   M€ 196,592

Total Funding:   M€ 93,425

NAME

SP

START

DURATION

DESCRIPTION

CAMMI SP8 15-12-2008 36 months The objective of CAMMI is to demonstrate a joint-cognitive approach to controlling devices, where a workload exceeding the operator’s capability ideally results in offloading non-critical, time-consuming tasks to autonomous agents (software, artificial-intelligence agents) and to let the operator focus his attention on critical tasks only.
CESAR SP1 1-3-2009 36 months CESAR targets significant reduction of overall development time and effort, between 30% and 50%, using a Reference Technology Platform (RTP). The aim is, within 5 years, to double the number of European technology providers and SMEs joining the CESAR ecosystem and reduce by 50% the cost of integration, configuration, deployment, and maintenance of tool-chains.
CHARTER SP1 1-4-2009 36 months CHARTER will develop concepts, methods, and tools for embedded system design and deployment that master complexity and substantially improve the development, verification and certification of critical systems.
CHESS SP1 1-2-2009 36 months CHESS aims to build modelling languages for extra-functional properties, and develop tools for evaluation of these properties of component contracts. It will adapt component infrastructures for the integration of real-time and dependable patterns, and validate the approach through multi-domain case studies.
eDIANA SP7 1-1-2009 36 months To enable sustainable urban life, eDIANA targets rationalization of the use of resources while increasing comfort by means of embedded systems technologies in residential and commercial buildings. To achieve greater efficiency in use of resources, it aims at prioritizing energy use, more flexibility in the provision of resources and better situation awareness for the citizen and for service and infrastructure owners.
EMMON SP3 1-3-2009 36 months EMMON will research, develop and test a functional prototype for large scale Wireless Sensor Networks. It aims to advance the number of devices by one order of magnitude compared to what is possible today, and develop simulation tools for networks two orders of magnitude larger than at present. The goal is to create technologies that allow effective monitoring with 10,000 to 100,000 devices, in an area of 50 square km in a real world scenario.
iLAND SP5 1-3-2009 36 months iLAND will develop enabling technologies for modular, component-based middleware for networked systems that demand deterministic, dynamic functional composition and reconfiguration. Its results embrace a lightweight middleware architecture offering deterministic services and QoS-based resource management, and an approach for modelling deterministic, dynamic reconfiguration and composition of applications, with validation through three application demonstrators.
INDEXYS SP5 1-4-2009 30 months INDEXYS will develop a cross-domain instantiation of the GENESYS embedded system architecture, for Industrial-grade exploitation on real-world platforms in Railway, Aerospace, Automotive and Industrial Control domains.
SCALOPES SP5 1-1-2009 24 months SCALOPES’ objective is to enable an industrially sustainable path for the evolution of low-power, multi-core computing platforms, for application domains with strategic value for European competitiveness.
SMART SP3 1-3-2009 36 months SMART will create an innovative WSN infrastructure based on both off-the shelf reconfigurable devices (FPGAs) and specially designed Reconfigurable Application Specific Instruction Set Processors (RASIPs). This infrastructure will support video and data compression as well as high-levels of security with lower power consumption than existing solutions.
SOFIA SP3 1-1-2009 36 months SOFIA will create an Open Innovation Platform (OIP) providing the interoperability that allows interaction between multi-vendor devices. For this, it will create interaction models and embedded devices that support a variety of “smart spaces” and a variety of users, and develop methods, techno-economic structures and toolkits for the deployment of smart environments and for the development of services and applications based on them. It will also define scenarios to demonstrate the capabilities of the OIP in personal spaces, indoor spaces and cities.
SYSMODEL SP5 1-1-2009 36 months SYSMODEL will develop supportive modelling tools for the design and implementation of time and power critical heterogeneous systems. The focus is on reuse of existing models and their integration in a heterogeneous system. The vision is to allow SMEs to build cost-efficient ambient intelligence systems with optimal performance, high confidence, reduced time to market and faster deployment.